Fatigue cracking is a key type of defect for liquid pipelines, and managing fatigue cracks has been a top priority and a big challenge for liquid pipeline operators. The existing inline inspection (ILI) tools for pipeline defect evaluation have large fatigue crack measurement uncertainties. Furthermore, the current physics-based methods are mainly used for fatigue crack growth prediction, where the same or a small range of fixed model parameters is used for all pipes. They result in uncertainty that is managed through the use of conservative safety factors such as adding depth uncertainty to the measured depth in deciding integrity management and risk mitigation strategies. In this study, an integrated approach is proposed for pipeline fatigue crack growth prediction utilizing ILI data including consideration of crack depth measurement uncertainty. This approach is done by integrating the physical models, including the stress analysis models, the crack growth model governed by the Paris’ law, and the ILI data. With the proposed integrated approach, the finite element (FE) model of a cracked pipe is built and the stress analysis is performed. ILI data are utilized to update the uncertain physical parameters for the individual pipe being considered so that a more accurate fatigue crack growth prediction can be achieved. Time-varying loading conditions are considered in the proposed integrated method by using rainflow counting method. The proposed integrated prognostics approach is compared with the existing physics-based method using examples based on simulated data. Field data provided by a Canadian pipeline operator are also employed for the validation of the proposed method. The examples and case studies in this paper demonstrate the limitations of the existing physics-based method, and the promise of the proposed method for achieving accurate fatigue crack growth prediction as continuous improvement of ILI technologies further reduces ILI measurement uncertainty.

References

1.
CEPA
,
2012
, “
About Pipelines, Our Energy Connections
,” Canadian Energy Pipeline Association, Calgary, AB, Canada,
Report
.
2.
Mohitpour
,
M.
,
Murray
,
A.
,
McManus
,
M.
, and
Colquhoun
,
I.
,
2010
,
Pipeline Integrity Assurance: A Practical Approach
,
American Society of Mechanical Engineers
,
New York
.
3.
Zarea
,
M.
,
Piazza
,
M.
,
Vignal
,
G.
,
Jones
,
C.
,
Rau
,
J.
, and
Wang
,
R.
,
2013
, “
Review of R&D in Support of Mechanical Damage Threat Management in Onshore Transmission Pipeline Operations
,”
ASME
Paper No. IPC2012-90654.
4.
PRCI
,
2014
, “
2014-Year in Review
,” Pipeline Research Council International, Chantilly, VA,
Report
.
5.
Nielsen
,
A.
,
Mallet-Paret
,
J.
, and
Griffin
,
K.
,
2014
, “
Probabilistic Modeling of Crack Threats and the Effects of Mitigation
,”
ASME
Paper No. IPC2014-33511.
6.
Sutton
,
A.
,
Hubert
,
Y.
,
Textor
,
S.
, and
Haider
,
S.
,
2014
, “
Allowable Pressure Cycling Limits for Liquid Pipelines
,”
ASME
Paper No. IPC2014-33566.
7.
Jardine
,
A. K. S.
,
Lin
,
D.
, and
Banjevic
,
D.
,
2006
, “
A Review on Machinery Diagnostics and Prognostics Implementing Condition-Based Maintenance
,”
Mech. Syst. Signal Process.
,
20
(
7
), pp.
1483
1510
.
8.
Mansor
,
N. I. I.
,
Abdullah
,
S.
,
Ariffin
,
A. K.
, and
Syarif
,
J.
,
2014
, “
A Review of the Fatigue Failure Mechanism of Metallic Materials Under a Corroded Environment
,”
Eng. Failure Anal.
,
42
, pp.
353
365
.
9.
Zhao
,
F.
,
Tian
,
Z.
, and
Zeng
,
Y.
,
2013
, “
Uncertainty Quantification in Gear Remaining Useful Life Prediction Through an Integrated Prognostics Method
,”
IEEE Trans. Reliab.
,
62
(
1
), pp.
146
159
.
10.
Bott
,
S.
, and
Sporns
,
R.
,
2008
, “
The Benefits and Limitations of Using Risk Based Probabilistic and Deterministic Analysis for Monitoring and Mitigation Planning
,”
ASME
Paper No. IPC2008-64539.
11.
Hong
,
S. W.
,
Koo
,
J. M.
,
Seok
,
C. S.
,
Kim
,
J. W.
,
Kim
,
J. H.
, and
Hong
,
S. K.
,
2015
, “
Fatigue Life Prediction for an API 5 L X42 Natural Gas Pipeline
,”
Eng. Failure Anal.
,
56
, pp.
396
402
.
12.
Pinheiro
,
B.
D
,
C.
, and
Pasqualino
,
I. P.
,
2009
, “
Fatigue Analysis of Damaged Steel Pipelines Under Cyclic Internal Pressure
,”
Int. J. Fatigue
,
31
(
5
), pp.
962
973
.
13.
Oikonomidis
,
F.
,
Shterenlikht
,
A.
, and
Truman
,
C. E.
,
2014
, “
Prediction of Crack Propagation and Arrest in X100 Natural Gas Transmission Pipelines With a Strain Rate Dependent Damage Model (SRDD)—Part 2: Large Scale Pipe Models With Gas Depressurisation
,”
Int. J. Pressure Vessels Piping
,
122
, pp.
15
21
.
14.
Oikonomidis
,
F.
,
Shterenlikht
,
A.
, and
Truman
,
C. E.
,
2013
, “
Prediction of Crack Propagation and Arrest in X100 Natural Gas Transmission Pipelines With the Strain Rate Dependent Damage Model (SRDD)—Part 1: A Novel Specimen for the Measurement of High Strain Rate Fracture Properties and Validation of the SRDD Model Parameters
,”
Int. J. Pressure Vessels Piping
,
105–106
, pp.
60
68
.
15.
Varela
,
F.
,
Yongjun Tan
,
M.
, and
Forsyth
,
M.
,
2015
, “
An Overview of Major Methods for Inspecting and Monitoring External Corrosion of on-Shore Transportation Pipelines
,”
Corros. Eng., Sci. Technol.
,
50
(
3
), pp.
226
235
.
16.
Bates
,
N.
,
Lee
,
D.
, and
Maier
,
C.
,
2010
, “
A Review of Crack Detection In-Line Inspection Case Studies
,”
ASME
Paper No. IPC2010-31114.
17.
Slaughter
,
M.
,
Spencer
,
K.
,
Dawson
,
J.
, and
Senf
,
P.
,
2010
, “
Comparison of Multiple Crack Detection In-Line Inspection Data to Assess Crack Growth
,”
ASME
Paper No. IPC2010-31255.
18.
Wang
,
H.
,
Yajima
,
A.
,
Y. Liang
,
R.
, and
Castaneda
,
H.
,
2015
, “
A Bayesian Model Framework for Calibrating Ultrasonic In-Line Inspection Data and Estimating Actual External Corrosion Depth in Buried Pipeline Utilizing a Clustering Technique
,”
Struct. Saf.
,
54
, pp.
19
31
.
19.
Zhao
,
F.
,
Tian
,
Z.
,
Bechhoefer
,
E.
, and
Zeng
,
Y.
,
2015
, “
An Integrated Prognostics Method Under Time-Varying Operating Conditions
,”
IEEE Trans. Reliab.
,
64
(
2
), pp.
673
686
.
20.
Roshanfar
,
M.
, and
Salimi
,
M. H.
,
2015
, “
Comparing of Methods of Cycle Calculating and Counting to the Rain Flow Method
,”
Ext. J. App. Sci.
,
3
(
7
), pp.
291
296
.
21.
NIST, Materials Reliability Division,
2007
, “
Mechanical Properties and Crack Behavior in Line Pipe Steels
,” National Institute of Standards and Technology Workshop, Boulder, CO, Report No. NISTIR 6649.
22.
Al-Muslim
,
H. M.
, and
Arif
,
A. F. M.
,
2010
, “
Effect of Geometry, Material and Pressure Variability on Strain and Stress Fields in Dented Pipelines Under Static and Cyclic Pressure Loading Using Probability Analysis
,”
ASME
Paper No. IPC2010-31246.
23.
Silva
,
J.
,
Ghaednia
,
H.
, and
Das
,
S.
,
2012
, “
Fatigue Life Assessment for NPS30 Steel Pipe
,”
ASME
Paper No. IPC2012-90081.
24.
Shim
,
D.
, and
Wilkowski
,
G.
,
2014
, “
Bulging Factor for Axial Surface Cracks in Pipes
,”
ASME
Paper No. IPC2014-33440.
25.
Newman
,
J.
, and
Raju
,
I.
,
1981
, “
An Empirical Stress-Intensity Factor Equation for the Surface Crack
,”
Eng. Fract. Mech.
,
15
(
1–2
), pp.
185
192
.
26.
Baker
,
M.
, Jr.
,
2004
, “
Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation
,” Kiefner and Associates, Inc., Columbus, OH, Final
Report
.
27.
Chookah
,
M.
,
Nuhi
,
M.
, and
Modarres
,
M.
,
2011
, “
A Probabilistic Physics-of-Failure Model for Prognostic Health Management of Structures Subject to Pitting and Corrosion-Fatigue
,”
Reliab. Eng. Syst. Saf.
,
96
(
12
), pp.
1601
1610
.
28.
Jin
,
Q.
,
Sun
,
Z.
, and
Guo
,
W.
,
2014
, “
Experimental and Finite Element Study on the Fatigue Growth of a Semi-Elliptical Surface Crack in aX80 Pipeline Steelspecimen
,”
Advances in Civil and Industrial Engineering IV
,
G
.
Li
,
C
.
Chen
,
B
.
Jiang
, and
Q.
Shen
, eds., Trans Tech Publications, Zurich, Switzerland, pp.
3026
3029
.
29.
Carpinteri
,
A.
, and
Brighenti
,
R.
,
1998
, “
Circumferential Surface Flaws in Pipes Under Cyclic Axial Loading
,”
Eng. Fract. Mech.
,
60
(
4
), pp.
383
396
.
30.
Carpinteri
,
A.
,
1993
, “
Shape Change of Surface Cracks in Round Bars Under Cyclic Axial Loading
,”
Int. J. Fatigue
,
15
(
1
), pp.
21
26
.
31.
Zhao
,
F.
,
Tian
,
Z.
, and
Zeng
,
Y.
,
2013
, “
A Stochastic Collocation Approach for Efficient Integrated Gear Health Prognosis
,”
Mech. Syst. Signal Process.
,
39
(
1–2
), pp.
372
387
.
32.
Enbridge and NDT Global, 2017, “
Enbridge and NDT Global: A Multi-year Collaboration Agreement
,” NDT Global, Calgary, AB, Canada, accessed Apr. 10, 2018 https://www.ndt-global.com/news/enbridge-partnership-to-advance-pipeline-technology-innovation
You do not currently have access to this content.