Abstract

This work presents a methodology for evaluating the uncontrolled external leakage probability of a subsea well during the production phase. Based on a barrier diagram, an algorithm for possible leak path identification is proposed, considering different operation modes: gas lift operation, free-flowing, or well closed at the subsea Christmas tree. Considering the equivalency between these paths and the minimum cut sets from a fault tree modeling, the uncontrolled external leakage probability is calculated using the upper bound approximation. The effect of common cause failures is considered for the failure mode fail-to-close-valve. The instantaneous availability function of each component is considered. Non-repairable, repairable, and periodically tested items are used. Probability distribution parameters are estimated in order to make a case study. The failure rate functions determined are used as input for the proposed model, regarding the following failure modes: fail-to-close, external-leakage, and internal-leakage at the closed position. Finally, failure probability results and sensitivity analysis are demonstrated for a base case study. Parameters like time between tests, inspections, and component reliability are varied in order to identify the impact on the uncontrolled external leakage probability. The main objective of the proposed methodology is to support decision-making on the well integrity management system during the production phase of a subsea well. To this end, actual and reliable input data should be considered.

References

1.
Stacey
,
A.
,
Sharp
,
J. V.
, and
Birkinshaw
,
M.
,
2008
, “
Life Extension Issues for Ageing Offshore Installations
,”
Proceedings of International Conference on Ocean, Offshore and Arctic Engineering
,
OMAE 2008-57411
.
2.
Vignes
,
B.
,
Andreassen
,
J.
,
Tonning
,
S. A.
,
2006
, “
PSA Well Integrity Survey, Phase 1 Summary Report
,”
Report 4010—705610 Brønnintegritet
,
Petroleum Safety Authority
,
Norway
.
3.
Shan
,
X.
,
Liu
,
K.
, and
Sun
,
P.-L.
,
2017
, “
Risk Analysis on Leakage of Natural Gas Pipelines by Fuzzy Baysean Network With a Bow-Tie Model
,”
Sci. Program.
,
2017
(
Paper ID 3639524
). 10.1155/2017/3639524
4.
Guo
,
Y.
,
Meng
,
X.
,
Wang
,
D.
,
Meng
,
T.
,
Liu
,
S.
, and
He
,
R.
,
2016
, “
Comprehensive Risk Evaluation of Long-Distance Oil and Gas Transportation Pipelines Using a Fuzzy Petri Net Model
,”
J. Nat. Gas Sci. Eng.
,
33
, pp.
18
29
. 10.1016/j.jngse.2016.04.052
5.
Oliveira
,
N.
, and
Netto
,
T. A.
,
2020
, “
Collapse Experiments and Reliability Analyses of Corroded Pipes for Offshore Applications
,”
ASME J. Offshore Mech. Arct. Eng.
,
142
(
2
):
021801
. 10.1115/1.4045012
6.
Bisaggio
,
H. C.
, and
Netto
,
T. A.
,
2015
, “
Predictive Analyses of the Integrity of Corroded Pipelines Based on Concepts of Structural Reliability and Bayesian Inference
,”
Mar. Struct.
,
41
, pp.
180
199
. 10.1016/j.marstruc.2015.02.003
7.
Li
,
X.
,
Chen
,
G.
, and
Zhu
,
H.
,
2016
, “
Quantitative Risk Analysis on Leakage Failure of Submarine Oil and Gas Pipelines Using Baysean Network
,”
Process Saf. Environ. Prot.
,
103-A
, pp.
163
173
. 10.1016/j.psep.2016.06.006
8.
Netto
,
T. A.
,
Honorato
,
H. J.
, and
Qassim
,
R. Y.
,
2013
, “
Prioritization of Failure Risk in Subsea Flexible Pipes via Data Envelopment Analysis
,”
Mar. Struct.
,
34
, pp.
105
116
. 10.1016/j.marstruc.2013.08.001
9.
Cheliyan
,
A. S.
, and
Bhattacharyya
,
S. K.
,
2018
, “
Fuzzy Fault Tree Analysis of Oil and Gas Leakage in Subsea Production Systems
,”
J. Ocean Eng. Sci.
,
3
(
1
), pp.
38
48
. 10.1016/j.joes.2017.11.005
10.
Lavasani
,
L. M.
,
Ramzali
,
N.
, and
Akyuz
,
E.
,
2015
, “
Utilisation of Fuzzy Fault Tree Analysis (FFTA) for Quantified Risk Analysis of Leakage in Abandoned oil and Natural-gas Wells
,”
Ocean Eng.
,
108
, pp.
729
737
. 10.1016/j.oceaneng.2015.09.008
11.
Wanik
,
P. G.
,
2015
,
Reliability Assessment of Subsea X-mas Tree Configurations, Master's thesis
, https://ntnuopen.ntnu.no/ntnu-xmlui/handle/11250/2351202?locale-attribute=en, NTNU-Norwegian University of Science and Technology.
12.
ISO 14224
,
2006
,
Petroleum, Petrochemical and Natural Gas Industries—Collection and Exchange of Reliability and Maintenance Data for Equipment
.
13.
Zhen
,
X.
,
Moan
,
T.
,
Gao
,
Z.
, and
Huang
,
Y.
,
2018
, “
Risk Assessment and Reduction for an Innovative Subsurface Well Completion System
,”
Energies
,
11
(
5
), p.
1306
. 10.3390/en11051306
14.
Yang
,
Y.
,
Yu
,
Y.
, and
Wang
,
L.
,
2011
, “
Approximate Instantaneous Availability and Its Error Analysis
,”
Proc. International Conference on Reliability, Maintainability and Safety (ICRMS)
,
Guiyang, China
.
15.
Gordis
,
J.
, and
Neta
,
B.
,
2000
, “
An Adaptive Method for the Numerical Solution of Volterra Integral Equations
,”
Proc. World Scientific and Engineering Society International Conference
,
Athens, Greece
.
16.
Cui
,
L.
, and
Xie
,
M.
,
2005
, “
Availability of a Periodically Inspected System With Random Repair or Replacement Times
,”
J. Stat. Plan. Inference
,
131
(
1
), pp.
89
100
. 10.1016/j.jspi.2003.12.008
17.
Corneliussen
,
K.
,
2006
, “
Well Safety, Risk Control in the Operational Phase of Offshore Wells
,”
Doctoral thesis
,
The Norwegian University of Science and Technology
,
Trondheim, Norway
.
18.
Rausand
,
M.
, and
Høyland
,
A.
,
2004
,
System Reliability Theory—Models, Statistical Methods, and Applications
, 2nd ed.,
John Wiley & Sons, Inc.
19.
WOLFRAM
.
Mathematica, Version 8
.
Wolfram Research
.
20.
Alves
,
A. L. R.
,
2012
, “
Instantaneous Availability of Subsea Wells During Production Phase
. M.Sc. dissertation,
COPPE/UFRJ
,
Brazil
(in Portuguese)
.
21.
Zanetti
,
A. A.
,
2014
, “
Comparative Analysis of Subsea Well Availability in Different Operational Scenarios
,” MSc dissertation,
COPPE/UFRJ
,
Brazil
(in Portuguese).
22.
OREDA
,
2015
,
Offshore Reliability Data Handbook 2015
, 6th ed.,
SINTEF
,
Norway
.
You do not currently have access to this content.