This paper analyzes and reviews various seismic damage at the Fukushima Daiichi Nuclear Power Station (F1) caused by the Great East Japan Earthquake (the Earthquake) on March 11 in 2011. Moreover, descriptions of various F1 accident reports on on-site seismic damage are comparatively analyzed. At first, impacts of the Earthquake and tsunami as well as damage at four influenced Nuclear Power Stations (NPSs), including F1, are comparatively analyzed. Although no safety-related equipment were seismically damaged at F1, there occurred various on-site seismic damage which should be learned at NPSs worldwide in preparation for next possible beyond-design-basis disasters. Particularly damaged were the main administration building as well as various on-site high-voltage equipment to receive off-site electric power. Owing largely to this on-site damage F1 lost the off-site power, eventually leading the entire NPS to station black-out. Other on-site seismic damage includes loss of an emergency data transmission system, roads, coolant water tanks, leakage of radio-contaminated water from spent fuel pools (SFP), presumably the Unit-1/2 exhaust stack among others.

References

1.
Akimoto
,
K.
,
2017
, “
Development and Issues of Air Dose Rate Monitoring Systems in Fukushima Prefecture With Emphasis on Portable Monitoring Posts
,”
Jpn. Health Phys.
,
52
, pp. 13–26 (in Japanese).
2.
TEPCO
,
2011
, “
Data at The Fukushima Daiichi Nuclear Power Station Measured During 11–21, March in 2011
,” Tokyo Electric Power Company, Tokyo, Japan, accessed July 16, 2018, http://www.tepco.co.jp/cc/press/betu11_j/images/110528d.pdf
3.
Environmental Radioactivity Monitoring Center of Fukushima
,
2011
, “
Air Dose Rates in March, 2011 (Data Retrieved From MPs of Fukushima Prefecture)
,” Fukushima Prefecture, Fukushima, Japan (in Japanese), accessed Aug. 2, 2018, http://www.atom-moc.pref.fukushima.jp/old/monitoring/monitoring201103/1_dose/pdf/201103_dose10_kooriyama.pdf
4.
Local Emergence Response Center of Fukushima Prefecture
,
2011
, “
① Results of Emergency Monitoring in the Vicinity of Fukushima Daiichi and Daini Nuclear Power Stations (11–15 March), ② List of Results of Monitoring in the Vicinity of Fukushima Daiichi Nuclear Power Station (air dose rates)
,”
Fukushima Prefecture
, Fukushima, Japan (in Japanese), accessed Aug. 3, 2018, http://warp.da.ndl.go.jp/info:ndljp/pid/3491887/www.meti.go.jp/press/2011/06/20110603019/20110603019-2.pdf
5.
Investigation Committee on the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company
, Government of Japan,
2011
, “
Interim Report
,” Medialand, Tokyo, Japan, accessed July 12, 2018, http://www.cas.go.jp/jp/seisaku/icanps/eng/interim-report.html
6.
TEPCO
,
2011
, “
Investigation Committee on the Accident at the Fukushima Daiichi Nuclear Power Plant: Fukushima Nuclear Accident Analysis Report (Interim Report)
,” Tokyo Electric Power Corporation, Tokyo, Japan, accessed June 9, 2018, http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/111202e14.pdf
7.
McNeill
,
D.
, and
Adelstein
,
J.
,
2011
, “
The Explosive Truth Behind Fukushima's Meltdown
,” The Independent, accessed May 22, 2018, http://www.independent.co.uk/news/world/asia/the-explosive-truth-behind-fukushimas-meltdown-2338819.html
8.
National Diet of Japan
,
2012
, “
The Official Report of the Fukushima Nuclear Accident Independent Investigation Commission
,” National Diet of Japan, Tokyo, Japan, accessed May 22, 2018, http://warp.da.ndl.go.jp/info:ndljp/pid/3856371/naiic.go.jp/en/report/
9.
Government of Japan
,
2012
, “
Investigation Committee on the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company, Final Report
,” Medialand, Tokyo, Japan, accessed May 22, 2018, http://www.cas.go.jp/jp/seisaku/icanps/eng/final-report.html
10.
Investigation Committee on the Accident at the Fukushima Daiichi Nuclear Power Plant, TEPCO
,
2012
, “
Fukushima Nuclear Accident Report
,” Tokyo Electric Power Corporation, Tokyo, Japan, accessed July 12, 2018, https://www4.tepco.co.jp/en/press/corp-com/release/2012/1205638_1870.html
11.
Nuclear Emergency Response Headquarters, Government of Japan,
2011
, “
Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety—The Accident at TEPCO's Fukushima Nuclear Power Stations
,” Government of Japan, Tokyo, Japan, accessed May 22, 2018, http://japan.kantei.go.jp/kan/topics/201106/iaea_houkokusho_e.html
12.
Data Research Team for NHK Special Program
,
2013
, “
The Meltdown, the Truth behind the Chain Reaction (Meruto-Daun, Rensa-No-Shinsou)
,” Kodansha, New York (in Japanese).
13.
Izumida
,
H.
,
2013
, “
Countermeasures for Security of Nuclear Power Plant
,”
Trans. At. Energy Jpn.
,
55
, pp.
686
687
(in Japanese).
14.
IAEA
,
2015
, “
Fukushima Daiichi Accident: Report by the Director General
,” International Atomic Energy Agency, Vienna, Austria, accessed May 22, 2018, http://www-pub.iaea.org/MTCD/Publications/PDF/Pub1710-ReportByTheDG-Web.pdf
15.
Atomic Energy Society of Japan
,
2014
,
The Fukushima Daiichi Nuclear Accident (Final Report of the AESF Investigation Committee
),
Maruzen Publishing
,
Tokyo, Japan
.
16.
Independent Investigation Commission on the Fukushima Nuclear Accident
,
2014
,
Fukushima Daiichi Nuclear Power Station Disaster: Investigating the Myth and Reality
,
Routledge
,
Abingdon, UK
.
17.
Miller
,
C.
,
Cubbage
,
A.
,
Dorman
,
D.
,
Grobe
,
J.
,
Holahan
,
G.
, and
Sanfilippo
,
N.
,
Recommendations for Enhancing Reactor Safety in the 21st Century
,
United States Nuclear Regulatory Commision
,
Rockville, MD
.
18.
ANS
,
2012
, “
Fukushima Daiichi: ANS Committee Report
,” American Nuclear Society, LaGrange Park, IL, accessed May 23, 2018, http://fukushima.ans.org/report/Fukushima_report.pdf
19.
Huffman
,
K.
,
2012
, “
Fukushima Daiichi Accident—Technical Causal Factor Analysis
,” Electric Power Research Institute, Palo Alto, CA, accessed May 23, 2018, https://www.epri.com/#/pages/product/000000000001024946/
20.
HM Chief Inspector of Nuclear Installations, Office for Nuclear Regulation
,
2011
, “
Japanese Earthquake and Tsunami: Implications for the UK Nuclear Industry: Final Report
,” Office for Nuclear Regulation, Bootle, UK, accessed July 12, 2018, http://www.onr.org.uk/fukushima/final-report.pdf
21.
The Institute of Nuclear Power Operations
,
2011
, “
The Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station
,” The Institute of Nuclear Power Operations, Atlanta, GA, accessed July 12, 2018, https://www.nrc.gov/docs/ML1134/ML11347A454.pdf
22.
NEA of OECD
,
2016
, “
Fukushima Daiichi Nuclear Accident
,” Nuclear Energy Agency, Boulogne-Bilancourt, France, accessed July 12, 2018, https://www.oecd-nea.org/fukushima/
23.
TEPCO
,
2007
, “
Impact of the Niigata Chuetsu-oki Earthquake on the Tokyo Electric Power Company (TEPCO) Kashiwazaki-Kariwa Nuclear Power Station and Countermeasures
,” Tokyo Electric Power Company, Tokyo, Japan, accessed July 12, 2018, http://www.tepco.co.jp/en/news/presen/pdf-1/0709-e.pdf
24.
TEPCO
,
2011
, ‘
Security Investigation on the Accident at the Fukushima Daiichi Nuclear Power Station
,” Tokyo Electric Power Company, Tokyo, Japan (in Japanese), accessed May 23, 2018, http://www.polano.org/13_f1/img/01_20111206-3hoancyousa.pdf
25.
Cook
,
D. H.
,
Greene
,
S. R.
,
Harrington
,
R. M.
,
Hodge
,
S. A.
, and
Yue
,
D. D.
,
1981
, “
Station Blackout Sequence at Browns Ferry Unit One Accident Sequence Analysis
,” Oak Ridge National Laboratory, Oak Ridge, TN, Report No. NUREG/CR-2182.
26.
NHK News Crew,
2017
, “
Essence of the Failure, Unit 1 Cooling at the Fukushima Daiichi Nuclear Power Plant
,” Kodansha, New York (in Japanese).
27.
TEPCO
,
2011
, “
Outline of Facility Structure of Unit 1 of Fukushima Daiichi Nuclear Power Station
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 23, 2018, http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_110810_04-e.pdf
28.
Hatamura
,
Y.
,
Abe
,
S.
,
Fuchigami
,
M.
,
Kasahara
,
N.
, and
Iino
,
K.
,
2015
,
The 2011 Fukushima Nuclear Power Plant Accident: How and Why It Happened
,
Woodhead Publishing
,
Cambridge, UK
.
29.
TEPCO
,
2014
, “
Fukushima Daiichi Nuclear Power Station, Influences of Tohoku District Pacific Ocean Offshore Earthquake on Nuclear Facilities
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 23, 2018, https://www.nsr.go.jp/data/000024969.pdf
30.
Nuclear and Industrial Safety Agency
,
2011
, “
On Security Investigation on the Accident at TEPCO's Fukushima Daiichi Nuclear Power Plant
,” Nuclear and Industrial Safety Agency, Tokyo, Japan (in Japanese), accessed July 14, 2018, http://warp.da.ndl.go.jp/info:ndljp/pid/3532877/www.nisa.meti.go.jp/shingikai/800/28/003/sankou3-3.pdf#5
31.
Kukita
,
Y.
, and
Watanabe
,
N.
,
2014
, “Seismically-Induced Reactor Coolant Leakage as an Allegedly-Possible Cause of Accident in Unit 1 of Fukushima Daiichi Nuclear Power Station,” Japan Atomic Energy Agency, Tokyo, Japan, Report No. AEA-Technology 2014-036, accessed Mar. 1, 2018, http://jolissrch-inter.tokai-sc.jaea.go.jp/pdfdata/JAEA-Technology-2014-036.pdf
32.
TEPCO
,
2012
, “
Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 23, 2018, http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120705_03-e.pdf
33.
TEPCO
,
2013
, “
Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 23, 2018, http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130409_10-e.pdf
34.
TEPCO,
2013
, “
Investigation Into Building Frames Around at Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130918_17-e.pdf
35.
TEPCO
,
2015
, “
Investigation Results of Main Steam Valve Room and Air-Lock Among Small Rooms in the Unit 1 RB
,” Tokyo Electric Power Company, Tokyo, Japan (in Japanese), accessed May 24, 2018, http://www.meti.go.jp/earthquake/nuclear/decommissioning/committee/osensuitaisakuteam/2015/pdf/1224_3_3b.pdf
36.
TEPCO
,
2011
, “
Investigation Results of the Unit 1 RB
,” Tokyo Electric Power Company, Tokyo, Japan (in Japanese), accessed May 24, 2018, http://www.tepco.co.jp/nu/fukushima-np/images/handouts_110514_02-j.pdf
37.
Tohoku Electric Power Co. Inc.,
2017
, “
Document 1-4, Status of Inspection on Unit 2 (Reactor Building) After the Tohoku-chihou Taiheiyou-oki Earthquake in 2011
,” Tohoku Electric Power Co. Inc., Sendai, Japan, accessed May 23, 2018, http://www.nsr.go.jp/data/000175278.pdf
38.
TEPCO
,
2013
, “
Seismic Safety Evaluation of the Damaged 1/2-Common Exhaust Stack at F1 (Oct.7, 2013, in Japanese)
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, Corresponding TEPCO document (September 18, 2013, in English): http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130918_14-e.pdf
39.
TEPCO
,
2013
, “Dose Rates underneath the Unit-1/2 Exhaust Stack at F1 (Dec. 6, 2013, in Japanese). Results of Dose Rate Measurements at the Connecting Section of the SGTS Pipes and the Common Exhaust Stack are Presented With Photos and Diagrams,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131206_04-j.pdf
40.
Tokyo Shimbun
,
2017
, “
A New Broken Section Identified at the Unit-1/2-Exhaust Stack at F1, This Newspaper Discovered
,” The Tokyo Shimbun, Tokyo, Japan.
41.
TEPCO
,
2017
, “
Special Inspection of the East Side of the Unit-1/2 Exhaust Stack
,” Another broken section was reported, Tokyo Electric Power Company, Tokyo, Japan (in Japanese), accessed May 24, 2018, http://www.tepco.co.jp/nu/fukushima-np/handouts/2017/images1/handouts_170406_06-j.pdf
42.
Tomura
,
N.
,
the Electric Power Development Co. Ltd.
,
2012
, “
Status of the Tokai Daini Nuclear Power Plant After the Tohoku-Chihou Taiheiyou-Oki Earthquake
,” Electric Power Development Co. Ltd., Tokyo, Japan, accessed May 24, 2018, http://www.aesj.or.jp/~safety/H241022seminorsiryou4.pdf
43.
TEPCO
, “
Status of Examination of the Unit-1/2 Exhaust Stack Dismantling (July 18, 2017, in Japanese)
,” TEPCO Document 1–3, Procedures and Schedule for Dismantling the Exhaust Stack are presented, Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.meti.go.jp/earthquake/nuclear/osensuitaisaku/committtee/genchicyousei/2017/pdf/0718_01e.pdf.
44.
TEPCO
,
2013
, “
Cause of Water Leakage Occurred on the 4th Floor in Unit 1
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/cc/direct/images/130219a.pdf
45.
TEPCO
,
2014
, “
Report on the Investigation and Study of Unconfirmed/Unclear Matters in the Fukushima Nuclear Accident, Progress Report No. 2, Impacts of the Earthquake on Unit-1
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/en/press/corp-com/release/betu14_e/images/140806e0110.pdf
46.
Nuclear Regulation Authority
,
2013
, “
Results of Field Study on the Water Bursting Incident on the Fourth Floor of Unit 1 at F1 (Attachment 1-2 for the 3rd Investigation Meeting for the Accident Analysis)
,” Nuclear Regulation Authority (in Japanese), accessed July 12, 2018, http://www.nsr.go.jp/data/000048769.pdf
47.
Technical Committee on Security Administration of Nuclear Power Plant in Niigata Prefecture
,
2015
, “
Field Study of Unit 1 at The Fukushima Daiichi Nuclear Power Plant (February 21, 2015, in Japanese)
,” Niigata Prefecture, Niigata, Japan, accessed May 24, 2018, http://www.pref.niigata.lg.jp/HTML_Article/729/216/150221gijiroku,0.pdf
48.
JNES
,
2011
, “
An Analysis of the Reactor Behavior During the Operation of the Emergency Isolation Condenser (IC) System at Unit 1 of the Fukushima Dai-Ichi Nuclear Power Station
,” The Japan Nuclear Energy Safety Organization, Report No. JNES-EV-2011-9011.
49.
TEPCO
,
2012
, “
Fukushima Daiichi Nuclear Power Plant, the Effects of the Tohoku-District Pacific Ocean-Offshore Earthquake to Reactor Facilities
,” Nuclear Energy Agency, Paris, France, accessed May 24, 2018, http://www.tepco.co.jp/cc/press/betu12_j/images/120509j0101.pdf
50.
NEA
,
2015
, “
Status Report on Spent Fuel Pools Under Loss-of-Cooling and Loss-of-Coolant Accident Conditions
,” Report, Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, https://www.oecd-nea.org/nsd/docs/2015/csni-r2015-2.pdf
51.
Nuclear System Safety Department, The Japan Nuclear Energy Safety Organization
,
2011
Analysis of Isolation Condenser at Unit 1 of the Fukushima DaiIchi NPS
,” JNES Report JNES-EV-2011-9011 (2011, in Japanese), accessed Aug. 2, 2018, http://warp.da.ndl.go.jp/info:ndljp/pid/10207746/www.nsr.go.jp/archive/jnes/content/000122882.pdf
52.
Stohl
,
A.
,
Seibert
,
P.
,
Wotawa
,
G.
,
Arnold
,
D.
,
Burkhart
,
J. F.
,
Eckhardt
,
S.
,
Tapia
,
C.
,
Vargas
,
A.
, and
Yasunari
,
T. J.
,
2012
, “Interactive Comments on
Xenon-133 and Caesium137 Releases Into the Atmosphere From the Fukushima Dai-Ichi Nuclear Power Plant: Determination of the Source Term, Atmospheric Dispersion, and Deposition
,”
Atmos. Chem. Phys. Discuss.
,
11
, pp.
C14956
C14964
.https://www.atmos-chem-phys-discuss.net/11/C14956/2012/acpd-11-C14956-2012.pdf
53.
Stohl
,
A.
,
Seibert
,
P.
,
Wotawa
,
G.
,
Arnold
,
D.
,
Burkhart
,
J. F.
,
Eckhardt
,
S.
,
Tapia
,
C.
,
Vargas
,
A.
, and
Yasunari
,
T. J.
,
2012
, “
Xenon-133 and Caesium-137 Releases Into the Atmosphere From the Fukushima Dai-Ichi Nuclear Power Plant: Determination of the Source Term, Atmospheric Dispersion, and Deposition
,”
Atmos. Chem. Phys.
,
12
(
5
), pp.
2313
2343
.https://www.atmos-chem-phys.net/12/2313/2012/acp-12-2313-2012.pdf
54.
TEPCO
,
2013
, “
Causes and Countermeasures for Dust Concentration Increases and Bodily Contamination in Front of the Fukushima Daiichi Nuclear Power Station's Seismic Isolated Building
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130912_08-e.pdf
55.
Office for Radiation Dose Rate Monitoring, Fukushima Prefecture
,
2013
, “
Temporary Increases of Air Dose Rates Observed at Monitoring Posts Around F1
,” Office for Radiation Dose Rate Monitoring, Fukushima Prefecture (in Japanese), accessed July 12, 2018, https://www.pref.fukushima.lg.jp/download/1/20130819moni.pdf
56.
Itoh
,
Y.
,
2014
, “
Revisitation: The Total Power Loss of Unit 1 at F1 Was Not Caused by Tsunami
,”
Kagaku
,
84
, pp.
e0001
e0026
.
57.
Itoh
,
Y.
, 2018, “
Was Tsunami the Cause of the Total Power Loss at the Fukushima Nuclear Power? 2
,” accessed May 24, 2018, http://www.shomin-law.com/essayFukushimaSBO2.html
58.
Nuclear and Industrial Safety Agency
,
2014
, “
Analysis of the Accident at Tokyo Electric Company Fukushima Daiichi Nuclear Accident
,” Nuclear and Industrial Safety Agency, Japan, accessed May 24, 2018, https://www.nsr.go.jp/data/000069286.pdf
59.
Nuclear Regulation Authority, 2013, “
Function Loss of EDG System A in Unit 1 (Attachment 3 for the 3rd Meeting of Investigation Committee for Accident Analysis
,” Nuclear Regulation Authority (in Japanese), accessed July 18, 2018, https://www.nsr.go.jp/data/000048771.pdf
60.
Integrated Engineering Committee
,
2014
, “
Investigation of the Unit 1 Accident at the Fukushima Daiichi Nuclear Power Station
,” Integrated Engineering Committee, Science Council of Japan, Nuclear Accident Response Subcommittee, accessed May 24, 2018, http://www.scj.go.jp/ja/member/iinkai/kiroku/3-140930-2.pdf
61.
TEPCO
,
2012
, “
Status of Response to the Accident at the Fukushima Daiichi Power Plant
,” Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, https://www4.tepco.co.jp/cc/press/betu12_j/images/120620j0305.pdf
62.
Madni
,
1994
, “
Analysis of Long Term Station Blackout Without Automatic Depressurization at Peach Bottom Using MELCOR (Version 1.8)
,” Brookhaven National Laboratory, Upton, NY, Report No. BNL-NUREG-52319, NUREG/CR-5850.
63.
Kobayashi
,
M.
,
Narabayashi
,
M.
,
Chiba
,
G.
,
Nagata
,
Y.
,
Tuji
,
M.
, and
Shimoe
,
T.
,
2015
, “
Accident Analysis of Fukushima Daiichi Nuclear Power Station Unit 1
,”
Trans. At. Energy Soc. Jpn.
,
14
(
1
), pp.
12
24
(in Japanese).
64.
Wichner
,
R. P.
,
Weber
,
C. F.
,
Lorenz
,
R. A.
,
Davis
,
W.
, Jr.
Hodge
,
S. A.
, and
Mitchell
,
A. D.
,
1982
, “
Station Blackout at Browns Ferry Unit One: Iodine and Noble-Gas Distribution and Release
,” Oak Ridge National Laboratory, Oak Ridge, TN, Report No.
NUREG/CR-2182
.https://inis.iaea.org/search/search.aspx?orig_q=RN:14724078
65.
Saji
,
G.
,
2017
, “
Preliminary Forensic Engineering Study on Aggravation of Radioactive Releases During the Fukushima Daiichi Accident
,”
Nucl. Eng. Des.
,
324
, pp.
315
336
.
66.
Saji
,
G.
,
2016
, “
Root Cause Study on Hydrogen Generation and Explosion Through Radiation-Induced Electrolysis in the Fukushima Daiichi Accident
,”
Nucl. Eng. Des.
,
307
, pp.
64
76
.
67.
JNES
,
2009
, “
Evaluation of Function Loss Probability of Off-Site Power Systems (Gaibu Dengen Keitou No Kinou Sonshitsu Kakuritsu Hyouka)
,” The Safety of Various Equipment of Off-Site Power Systems Against Earthquakes Were Evaluated on the Basis of Function Loss Probability, Japan Nuclear Energy Safety Organization, Japan.
68.
TEPCO
,
2018
, “
Analysis of the Fundamental Causes of the Accident, Responsibilities to Fukushima (Jiko no konpon-gen-in bunseki)
,” Tokyo Electric Power Company, Tokyo, Japan, accessed July 18, 2018, http://www.tepco.co.jp/fukushima/review/root_cause_analysis.html
69.
TEPCO
,
2018
, “
The Development of and Lessons From the Fukushima Daiichi Nuclear Accident
,” Earthquake & Accident in Decommissioning Plan of Fukushima Daiichi Nuclear Power in Securing Stable Power Supply, Tokyo Electric Power Company, Tokyo, Japan, accessed May 24, 2018, http://www.tepco.co.jp/en/decommision/accident/images/outline01.pdf
70.
The Kobe Shimbun NEXT
,
2013
, “
An Ex-Worker at The Fukushima Daiichi Said TEPCO is Unreliable
,” The Kobe Shimbun (in Japanese), accessed July 18, 2018, http://www.kobe-np.co.jp/news/backnumber/201309/0008697458.shtml
71.
The Kobe Shimbun
,
2011
, “
Disjointed Pipes, Intimidating Water Terrifying Testimonies of NPS Workers
,” The Yomiuri Shimbun (in Japanese), accessed June 18, 2018, http://blog.goo.ne.jp/jpnx05/e/35ab29f7b58a721a6696aac944e3510a
72.
The Atlantic,
2011
, “
Meltdown: What Really Happened at Fukushima?
,” The Atlantic, accessed May 24, 2018, http://www.theatlantic.com/international/archive/2011/07/meltdown-what-really-happened-fukushima/352434/
73.
The Asahi Simbun
,
2013
, “
Traps of Prometheus (Prometheus No Wana)
,” The Asahi Simbun, Tokyo, Japan.
74.
Department of Science and Culture, NHK
,
2011
, “
Smoke From Unit 1, Equipment Collapsed in Unit 4 (Unit 4 Worker)
,” NHK (in Japanese).
You do not currently have access to this content.