The Balakovo Nuclear Power Plant operating in Russia has four operating units of a VVER-1000 type. The first unit was connected to the grid on Dec. 28, 1985, and put in commercial operation on May 23, 1986. According to modern requirements of the Russian Nuclear Regulatory Authority, the full-scope probabilistic safety assessment (PSA) must be performed to extend the license for operation beyond an initial 30-year lifetime of the unit. The paper presents the results of the Level 1 PSA covering internal initiating events for power and shutdown operational plant states, internal hazards (fires and floods), and external hazards, including natural and man-made events, in particular, seismic impact, and aircraft crash.

References

1.
Rostechnadzor of the Russian Federation
,
2008
, “
Administrative Regulations for Execution of State Function of Licensing Activities in the Area of Utilization of Nuclear Power by Federal Service for Environmental, Technological and Nuclear Regulation
,”
Rostechnadzor of the Russian Federation
, Moscow.
2.
Rostechnadzor of the Russian Federation
,
2015
, “
General Provisions of Safety of Nuclear Power Plants
,”
Rostechnadzor of the Russian Federation
, Moscow, .
3.
Rostechnadzor of the Russian Federation
,
2011
, “
Provisions of Main Recommendations on Conducting Level 1 Probabilistic Safety Assessment for Internal Initiating Events occurring at All Plant Operational Modes
,”
Rostechnadzor of the Russian Federation
, Moscow, .
4.
International Atomic Energy Agency
,
2010
, “Development and Application of Level 1 Probabilistic Safety Assessment for Nuclear Power Plants,”
IAEA Safety Standards, Specific Safety Guide SSG-3
,
IAEA
,
Vienna
.
5.
Migrov
,
Ju. A.
,
The First Base Version Thermohydraulic Code KORSAR/B1.1
,
FGUP NITI
,
Russia
,
2002
.
6.
Risk Spectrum
,
Lloyd’s Register Consulting, Version 3.1.0
, http://www.riskspectrum.com/en/risk/
7.
Swain
,
A. D.
, and
Guttman
,
H. E.
,
1983
,
Handbook of Human Reliability Analysis With Emphasis on Nuclear Power Plant Applications (THERP)
, NUREG/CR-1278,
Sandia National Labs
,
Albuquerque, NM
.
8.
Spurgin
,
A. J.
,
Moieni
,
P.
,
Gaddy
,
C. D.
,
Parry
,
G.
,
Orvis
,
D. D.
,
Spurgin
,
J. P.
,
Joksimovitch
,
V.
,
Gaver
,
D. P.
,
Hannaman
,
G. W.
,
1990
, “
Operator Reliability Experiments Using Power Plant Simulators
,”
Electric Power Research Institute
, Palo Alto, CA, .
9.
Bareith
,
A.
, and
Spurgin
,
A. J.
,
1997
, “
Treatment of Human Factors for Improvements at the Paks Nuclear Power Plant
,”
PSAM-III International Conference on Probabilistic Safety Assessment and Management
,
Crete, Greece
,
Springer London Ltd
,
Godalming, Surrey
.
10.
Rostechnadzor of the Russian Federation
,
2012
, “
Provisions of Main Recommendations on Conducting Level 1 Probabilistic Safety Assessment of Nuclear Power Plant for Initiating Events Caused by Internal Fires and Floods
,”
Rostechnadzor of the Russian Federation
, Moscow, .
11.
CFAST—Consolidated Model of Fire Growth and Smoke Transport (Version 6.2)
,
2013
,
Technical Reference Guide
,
National Institute of Standards and Technology
, fire.nist.gov/bfrlpubs/fire04/PDF/f04046.pdf.
12.
1002989
,
2003
,
Seismic Probabilistic Risk Assessment Implementation Guide
,
EPRI
,
Paolo Alto, CA
.
13.
IAEA-TECDOC-724
,
1993
,
Probabilistic Safety Assessment for Seismic Events
,
International Atomic Energy Agency
,
Vienna, Austria
.
14.
Gosatomnadzor of the Russian Federation
,
2014
, “
Recommendations on Performing Level 1 Probabilistic Safety Assessment of Nuclear Power Plant for Initiating Events of External Natural and Man-made Origin
,”
Rostechnadzor of the Russian Federation
, Moscow, .
15.
International Atomic Energy Agency
,
1999
, “
Basic Safety Principles for Nuclear Power Plants: 75-INSAG-3 Rev. 1: A Report by the International Nuclear Safety Advisory Group
,”
International Atomic Energy Agency
, Vienna, .
You do not currently have access to this content.