Skip Nav Destination
ASME Press Select Proceedings
International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-China 2011), Volumes 1–3
By
ISBN:
9780791859810
No. of Pages:
906
Publisher:
ASME Press
Publication date:
2011
eBook Chapter
99 A Model and Algorithm for the Yard Crane Scheduling Problem under Stochastic Environment
By
Zhicheng Bian
,
Zhicheng Bian
SMU Logistics Research Center,
Shanghai Maritime University
, Shanghai, 200135
, PR China
.
Search for other works by this author on:
Daofang Chang
,
Daofang Chang
School of Mechanical Engineering,
Shanghai Jiao Tong University
, Shanghai, 200240
, PR China
Search for other works by this author on:
Weijian Mi
Weijian Mi
School of Logistics Engineering,
Shanghai Maritime University
, Shanghai, 200135
, PR China
Search for other works by this author on:
Page Count:
10
-
Published:2011
Citation
Bian, Z, Chang, D, & Mi, W. "A Model and Algorithm for the Yard Crane Scheduling Problem under Stochastic Environment." International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-China 2011), Volumes 1–3. Ed. Xie, Y. ASME Press, 2011.
Download citation file:
This paper aims at advancing a heuristic algorithm for the yard crane deploying problem under stochastic environment. In this study, a dynamic integer programming for the problem is initially developed. Taking account of the stochastic and complex characteristic of this model, it is then converted into an equivalent expression, and a heuristic algorithm is supposed to solve this model. Finally, some numerical experiments are taken to illustrate the efficiency of this algorithm, and a plan of yard crane scheduling is also shown for instance.
Abstract
Key Words
1. Introduction
2. Literature Review
3. The Mathematical Model
4. The Heuristic Algorithm
5. Numerical Experiments
6 Conclusion
Acknowledgement
References
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Chapters
Continuous Dynamic Berth Allocation Strategy Basing on Quay-Crane Scheduling
International Conference on Advanced Computer Theory and Engineering, 5th (ICACTE 2012)
Researches on the Dynamic Changes of Wetland Ecologic Landscape Pattern Based on 3S Techniques
International Conference on Optimization Design (ICOD 2010)
Quay Crane Scheduling with Non-Interference Constraints by Multiobjective Genetic Algorithm
Intelligent Engineering Systems through Artificial Neural Networks
A Collection of Handy Hydraulic Formulas Based on an Industry-Standard Reference for Pressure Drop Calculations, Incompressible Fluid Flow in Piping and Ducts—Crane Technical Paper No. 410
Hydraulics, Pipe Flow, Industrial HVAC & Utility Systems: Mister Mech Mentor, Vol. 1
Related Articles
Reducing Overshoot in Human-Operated Flexible Systems
J. Dyn. Sys., Meas., Control (January,2011)
Dynamics and Control of a Small-Scale Boom Crane
J. Comput. Nonlinear Dynam (July,2011)
Command Shaping for Flexible Systems Subject to Constant Acceleration Limits
J. Dyn. Sys., Meas., Control (September,2008)