In Arctic regions, oil and gas (O&G) operations are adversely affected by harsh weather conditions and severe meteorological phenomena such as icing storms and, in certain regions, polar low pressures. Potential solutions, such as implementing winterisation concepts, are explored in the design and even operation phases in order to overcome such obstacles. Simply, the main aim of winterisation is to provide the crew and equipment units with a range of normal environmental and working conditions through, for instance, insulating equipment units, installing heat tracers, enclosing working areas, providing the crew with adequate clothing, etc.

There are, however, some concerns about the efficiency of such winterisation measures and potential changes in operation risk level, of which the changes in plant downtime, production loss, and plant maintainability are the focus of present study. The issue of complex effects of winterisation measures on maintainability analysis of O&G plants operating in the Arctic offshore has gained little attention in the literature. In this study, different aspects of winterisation from the viewpoint of equipment maintainability are discussed. Further, a mathematical framework for maintainability analysis of equipment units subjected to winterisation measures is proposed. The impact of winterisation-related downtimes on plant downtime is analysed as well by employing a Monte Carlo system simulation technique. The application of the proposed framework is illustrated by a case study. The results are further compared with those for a non-winterised system designed for normal-climate regions.

This content is only available via PDF.
You do not currently have access to this content.