Petrobras developed a new kind of anchoring device known as Torpedo. This is a steel pile of appropriate weight and shape that is launched in a free fall procedure to be used as fixed anchoring point by any type of floating unit. There are two Torpedoes, T-43 and T-98 weighing 43 and 98 metric tons respectively. On October 2002 T-43 was tested offshore Brazil in Campos Basin. The successful results approved and certified by Bureau Veritas, and the need for a feasible anchoring system for new Petrobras Units in deep water fields of Campos Basin led to the development of a Torpedo with High Holding Power. Petrobras FPSO P-50, a VLCC that is being converted with a spread-mooring configuration will be installed in Albacora Leste field in the second semester of 2004. Its mooring analysis showed that the required holding power for the mooring system would be very high. Drag embedment anchors option would require four big Anchor Handling Vessels for anchor tensioning operations at 1400 m water depth. For this purpose T-98 was designed and its field tests were completed in April 2003. This paper discusses T-98 design, building, tests and ABS certification for FPSO P-50.
Skip Nav Destination
ASME 2004 23rd International Conference on Offshore Mechanics and Arctic Engineering
June 20–25, 2004
Vancouver, British Columbia, Canada
Conference Sponsors:
- Ocean, Offshore, and Arctic Engineering Division
ISBN:
0-7918-3743-2
PROCEEDINGS PAPER
High Holding Power Torpedo Pile: Results for the First Long Term Application
Jairo Bastos de Araujo,
Jairo Bastos de Araujo
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Search for other works by this author on:
Roge´rio Diniz Machado,
Roge´rio Diniz Machado
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Search for other works by this author on:
Cipriano Jose de Medeiros Junior
Cipriano Jose de Medeiros Junior
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Search for other works by this author on:
Jairo Bastos de Araujo
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Roge´rio Diniz Machado
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Cipriano Jose de Medeiros Junior
Petro´leo Brasileiro S.A., Rio de Janeiro, RJ, Brazil
Paper No:
OMAE2004-51201, pp. 417-421; 5 pages
Published Online:
December 22, 2008
Citation
de Araujo, JB, Machado, RD, & de Medeiros Junior, CJ. "High Holding Power Torpedo Pile: Results for the First Long Term Application." Proceedings of the ASME 2004 23rd International Conference on Offshore Mechanics and Arctic Engineering. 23rd International Conference on Offshore Mechanics and Arctic Engineering, Volume 1, Parts A and B. Vancouver, British Columbia, Canada. June 20–25, 2004. pp. 417-421. ASME. https://doi.org/10.1115/OMAE2004-51201
Download citation file:
60
Views
0
Citations
Related Proceedings Papers
Related Articles
An Investigation Into the Effect of Turret Mooring Location on the Vertical Motions of an FPSO Vessel
J. Offshore Mech. Arct. Eng (May,1999)
Profiles of Two JOMAE Associate Editors (A Continuing Series)
J. Offshore Mech. Arct. Eng (October,2021)
Optimal Offloading Configuration of Spread-Moored FPSOs
J. Offshore Mech. Arct. Eng (May,2009)
Related Chapters
The Impact of Plant Economics on the Design of Industrial Energy Systems
Industrial Energy Systems
Dismantling
Decommissioning Handbook
Small Raindrops
Case Studies in Fluid Mechanics with Sensitivities to Governing Variables