In this digest an overload predicting algorithm is proposed based on the converter operating point and the thermal model of a 6.5 KV Silicon IGBT module. This algorithm can predict both the overload and the time interval for overload and hence can be used for thermal cycle performance evaluation for converters.

This content is only available via PDF.
You do not currently have access to this content.