The U.S. NRC is currently evaluating nuclear plant responses to Generic Letter (GL) 96-06, “Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions” [1]. GL 96-06 is concerned with potential two-phase flow and water hammer conditions that could be present in the cooling water systems of nuclear power plants during design-basis accidents. Nuclear power plants rely on large capacity service water pumps to supply cooling water flow, via an extensive pipe network, to heat exchangers such as room coolers, pump lube oil coolers, and containment air coolers (CACs), for normal and abnormal plant operation. Following a postulated a loss of offsite power (LOOP) event, the normal electrical power supply to the service water pump would be lost resulting in a 20 to 30 second cooling water flow interruption while a diesel generator is started and the service water pump load is sequenced onto the diesel generator. In power plants, such as the Davis-Besse Nuclear Power Plant with open service water systems that draw from a lake or a river and supply safety-related CAC heat exchangers located 30 to 40 feet above the pump outlet, this could lead to cold water column separation in the heat exchanger supply and return piping. If a loss of coolant accident (LOCA) occurs coincident with the LOOP, then boiling in the CAC heat exchanger tubes could occur, as well. Upon restoration of the cooling water flow, dynamic loading could be expected as steam condenses and water columns rejoin. The TREMOLO computer program [2,3] has been used to calculate dynamic thermal hydraulic response and reaction forces in service water piping systems for several nuclear power plants in response to GL 96-06. A consistent result obtained in each of these GL 96-06 analyses is that the LOOP + LOCA scenario produces the bounding loads rather than the LOOP-only scenario. This result seemingly contradicts current industry thinking which suggests that because the water columns are colder and the void fraction lower during LOOP-only scenarios, the LOOP-only loads should be bounding [4,5,6]. While the physics supports the conclusion that the rejoining of colder water columns will generally yield the largest water hammer pressure rise, when actual plant geometry and credible accident scenarios are analyzed, a different picture emerges. This paper couples insights obtained from the GL 96-06 TREMOLO analysis of the Davis-Besse Nuclear Power Plant with independent hand calculations and experimental evidence to support the conclusion that the LOCA+LOOP scenario will produce the bounding loads in service water piping systems.
Skip Nav Destination
ASME/JSME 2003 4th Joint Fluids Summer Engineering Conference
July 6–10, 2003
Honolulu, Hawaii, USA
Conference Sponsors:
- Fluids Engineering Division
ISBN:
0-7918-3696-7
PROCEEDINGS PAPER
Calculation of Bounding Pressures Due to Condensation-Induced Water Hammer at the Davis-Besse Nuclear Power Plant in Response to Generic Letter 96-06
G. Thomas Elicson,
G. Thomas Elicson
Fauske & Associates, Inc.
Search for other works by this author on:
James P. Burelbach,
James P. Burelbach
Fauske & Associates, Inc.
Search for other works by this author on:
Theodore A. Lang
Theodore A. Lang
Davis-Besse Nuclear Power Plant, Oak Harbor, OH
Search for other works by this author on:
G. Thomas Elicson
Fauske & Associates, Inc.
James P. Burelbach
Fauske & Associates, Inc.
Theodore A. Lang
Davis-Besse Nuclear Power Plant, Oak Harbor, OH
Paper No:
FEDSM2003-45278, pp. 2989-2997; 9 pages
Published Online:
February 4, 2009
Citation
Elicson, GT, Burelbach, JP, & Lang, TA. "Calculation of Bounding Pressures Due to Condensation-Induced Water Hammer at the Davis-Besse Nuclear Power Plant in Response to Generic Letter 96-06." Proceedings of the ASME/JSME 2003 4th Joint Fluids Summer Engineering Conference. Volume 1: Fora, Parts A, B, C, and D. Honolulu, Hawaii, USA. July 6–10, 2003. pp. 2989-2997. ASME. https://doi.org/10.1115/FEDSM2003-45278
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
An Analytical Model for Prediction of Two-Phase (Noncondensable) Flow Pump Performance
J. Fluids Eng (March,1985)
Water Hammer Phenomena in Gas-Water Two-Phase Bubbly Flow Through a 90-Degree Bend Tube
J. Fluids Eng (July,2003)
Flow Visualization of Submerged Steam Jet in Subcooled Water
J. Heat Transfer (February,2016)
Related Chapters
Insights and Results of the Shutdown PSA for a German SWR 69 Type Reactor (PSAM-0028)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition