This paper presents the economic optimization of indirect sewage sludge heat dryer for sewage sludge incineration plants. The objective function based on two-phase heat transfer, and economic relations is provided to demonstrate the optimum size for the minimum investment cost. De-watered sludge is fed into the dryer with a mass flow rate of 165 tons per day and consists of 27% dry matter. After the sludge drying process, the dryness of sludge increases up to 40%. In the indirect sludge dryer unit, thermal oil is used to heat the dryer wall and to prevent heat loss. Thermal oil is circulated in a closed cycle and gathered into an oil tank. Total cost of the sludge dryer unit changes proportional to the dryer area. The optimum dryer area is found as 32.54 m2. The corresponding minimum cost is found as $35,700.
- Advanced Energy Systems Division
- Solar Energy Division
Economic Optimization of Indirect Sewage Sludge Heat Dryer Unit for Sewage Sludge Incineration Plants
Demir, S, Karabasoglu, O, Akkerman, V, & Abusoglu, A. "Economic Optimization of Indirect Sewage Sludge Heat Dryer Unit for Sewage Sludge Incineration Plants." Proceedings of the ASME 2015 9th International Conference on Energy Sustainability collocated with the ASME 2015 Power Conference, the ASME 2015 13th International Conference on Fuel Cell Science, Engineering and Technology, and the ASME 2015 Nuclear Forum. Volume 1: Advances in Solar Buildings and Conservation; Climate Control and the Environment; Alternate Fuels and Infrastructure; ARPA-E; Combined Energy Cycles, CHP, CCHP, and Smart Grids; Concentrating Solar Power; Economic, Environmental, and Policy Aspects of Alternate Energy; Geothermal Energy, Harvesting, Ocean Energy and Other Emerging Technologies; Hydrogen Energy Technologies; Low/Zero Emission Power Plants and Carbon Sequestration; Micro and Nano Technology Applications and Materials. San Diego, California, USA. June 28–July 2, 2015. V001T06A002. ASME. https://doi.org/10.1115/ES2015-49155
Download citation file: